|
It probably takes about 3 hrs for most, 2 or less for the "mod monsters." For me it took longer, but I had a 'helper' (my 4 year old son who always needs a wrench different than the one he has) and I had to learn the valuable lesson of assembling the end-links on the frame bracket. Also, had one trip to Lowe's in there for the two 1/2" flat washers.
I'll take some pics soon since still have the rear wheels off to paint the calipers.
Happy modding - Dan :bo:
__________________
NHTOC # 68 2002 DSG
FTVB & deep pan - awesome!
Front and Rear Hellwig swaybars, bilstein shocks, Denso IT20, Column pod w/ Autometer ultra-lite boost gauge, K&N panel, Retrax tonneau, slotted/dimpled rotors & Hawk HPS pads, LFP e-fan, LFP heat exchanger, 170° Stant t-stat
|