As could be expected, direct and to the point.
[list=1][*]Disconnect negative battery terminal.[*]Loosen intake boot band clamps, disconnect three vacuum tubes under the boot and remove.
[*]Disconnect Throttle body linkage and TPS sensor plug.
[*]Remove three 10mm throttle linkage bracket nuts.[*]Move Throttle linkage from its mount and move aside.[*]Remove throttle body. (2) 8mm bolts, (2) 10mm bolts.[*]Gently remove throttle body gasket from the front of the upper plenum and set aside.[*]Disconnect all three passenger side vacuum lines.
[*]Disconnect the driver’s side vacuum line and brake booster line at the rear of the blower.
[*]Remove the two 10mm EGR bolts[*]Remove the two 8mm IAC bolts. Reattach to C&L Upper plenum.
[*]Remove six Upper plenum bolts, NOTE the lengths.
[*]Slowly remove the stock upper plenum and old blower upper plenum gasket. Discard old gasket and set stock upper plenum aside.
NOTE: The surfaces are soft metals. Clean them carefully.
[*]Place the new included upper plenum gasket into position.[*]Starting at the firewall, begin threading all six upper plenum bolts by hand.[*]Once all six bolts are threaded, tighten all upper plenum bolts in two stages:
a. Tighten to 89 in/lbs, NOT ft/lbs.
b. Tighten and additional 90 degrees.[*]Reconnect two vacuum lines on driver’s side.[*]Reattach brake booster vacuum line pinch clamp.
[*]Reattach throttle linkage bracket and torque nuts to 89 in/lbs.[*]Reattach throttle linkages:
a. Speed control actuator cable
b. Accelerator cable
c. Throttle return spring.[*]Connect passenger side vacuum lines and vent hose.[*]Attach IAC and TPS electrical connections.
[*]Reinstall the two EGR bolts and tighten in two stages:
a. Tighten to 15 ft/lbs.
b. Tighten bolts an additional 90 degrees.[*]Reinstall intake boot, tighten band clamps, and reinsert three vacuum lines.
[*]Connect negative battery terminal and TEST DRIVE![/list=1]
Bob